Legacy PLC migrations
SLC 500, PLC-5, and MicroLogix moved to CompactLogix or ControlLogix. S7-300/400 moved to S7-1500. Logic is converted and cleaned up, not just copied.
Retrofits & PLC upgrades
Most conveyor frames and rollers outlast their controls. We replace obsolete PLCs, first-generation MDR cards, relay logic, and lineshaft drives in stages, with cutovers planned around your shipping schedule.


What we upgrade
Every retrofit starts with what is there now: the program, any drawings, the field wiring, and how the conveyor actually runs on a busy day.
SLC 500, PLC-5, and MicroLogix moved to CompactLogix or ControlLogix. S7-300/400 moved to S7-1500. Logic is converted and cleaned up, not just copied.
Lineshaft and belt-driven roller sections converted to MDR where accumulation, noise, or energy use is the problem, often section by section.
Older discrete or serial-networked cards replaced with current Ethernet cards so the PLC can see zone status and faults.
New sections, merges, or a sorter tied into an existing system, with power and network capacity checked first.
DeviceNet, DH+, Remote I/O, or Profibus moved to EtherNet/IP or PROFINET with managed switches and an IP plan.
E-stop and pull-cord circuits reviewed against current practice and redesigned where a single fault could defeat the stop.
Why upgrade
Old conveyor controls often run until a part fails during peak. Upgrading on your schedule keeps that decision in your hands.
End-of-life PLCs, cards, and drives get scarce and expensive, and lead times stretch when you need them most.
Current cards and PLCs report zone status, faults, and counts. Older systems often report nothing until something stops.
Better merge and release logic recovers throughput without changing the mechanical conveyor.
Current platforms are documented and familiar to new technicians and other integrators.
A planned weekend cutover costs far less than an unplanned outage during a shipping peak.
How we approach it
We review the existing program, panels, and field wiring and record how each section behaves today, including the workarounds operators rely on.
New panels, cordsets, and programs are built and tested before the outage, so the shutdown is for installation and checkout only.
Large systems are cut over section by section, with temporary interfaces so old and new controls can run side by side.
Drawings, zone lists, program backups, and card configurations updated to match the upgraded system.

Time to upgrade
Photos of the panels, the PLC model and firmware, and a rough layout are enough to start. We’ll tell you what to replace now, what can wait, and how to sequence the cutover.
Next step
Tell us the PLC platform, the MDR or drive hardware, and when you can take the conveyor down. We’ll help you scope the work and the changeover.
Mon–Fri, 9:00 AM – 4:00 PM ET · we reply within one business day
Engineering offices in Clearwater, Florida · available for Zoom meetings
Thanks. An engineer will follow up within one business day. Anything to add? Email [email protected].